HelixOps Validation
OQ OQ-HELIX-001

Operational Qualification Protocol

HelixOps Quality Management System - GxP Validation Documentation

Version: Draft v0.1
Effective: January 2025
Status: Draft
Author
HelixOps Team
Reviewer
QA Lead
Approver
Quality Assurance

1. Introduction #

This Operational Qualification (OQ) protocol verifies that the HelixOps system is correctly installed and configured according to the specifications defined in DS-HELIX-001.

OQ Purpose

OQ testing ensures the system operates within specified parameters in the installed environment, verifying installation, configuration, and security controls.

15
Total Tests
3
Test Categories
0%
Complete

2. Test Scope #

Installation

Verify correct deployment of all system components

Configuration

Verify system settings match specifications

Security

Verify security controls are operational

3. Prerequisites #

Before Testing

  • [ ] Test environment provisioned and isolated
  • [ ] Test data loaded (non-production data only)
  • [ ] Tester credentials created for all roles
  • [ ] DS-HELIX-001 approved and available
  • [ ] Test tools installed (browser, API client)

4. Installation Tests #

These tests verify that all system components are correctly installed and operational.

Test ID Test Name Expected Result Status Tester Date
OQ-INST-001 Database Connection PostgreSQL connection established Pending
OQ-INST-002 Application Server Start Server starts on port 5000 Pending
OQ-INST-003 Frontend Build React app builds without errors Pending
OQ-INST-004 Environment Variables All required env vars present Pending
OQ-INST-005 Database Migration All migrations applied successfully Pending

5. Configuration Tests #

These tests verify that system configuration matches the design specifications.

Test ID Test Name Expected Result Status Tester Date
OQ-CONF-001 OIDC Provider Config Authentication flow completes Pending
OQ-CONF-002 Session Timeout 15-minute timeout enforced Pending
OQ-CONF-003 RBAC Configuration Admin/Manager/Viewer roles functional Pending
OQ-CONF-004 Audit Logging All actions logged with timestamp Pending
OQ-CONF-005 TLS Configuration TLS 1.3 enforced Pending

6. Security Tests #

These tests verify that security controls are properly implemented and functional.

Test ID Test Name Expected Result Status Tester Date
OQ-SEC-001 Authentication Required Unauthenticated requests blocked Pending
OQ-SEC-002 Authorization Enforcement Role-based access enforced Pending
OQ-SEC-003 SQL Injection Prevention Parameterized queries used Pending
OQ-SEC-004 XSS Prevention Output encoding applied Pending
OQ-SEC-005 CSRF Protection CSRF tokens validated Pending

7. Test Summary #

Execution Summary

15
Total Tests
0
Passed
0
Failed
15
Pending
Execution Start:
Execution End:
Overall Result: Pending
Deviations: 0

Test Protocol Approval

Executed By
Signature
QA Tester
Quality Assurance
Reviewed By
Signature
QA Lead
Quality Management
Approved By
Signature
QA Manager
Quality Assurance

Electronic signatures are considered equivalent to handwritten signatures in accordance with 21 CFR Part 11 requirements.